Spatial Brief Academy / Module 9 of 13
Module 9 · 1¼ hours
The libraries in depth
By the end of this module you can
- Place components, blocks and your own items
- Use the fit-out library: furniture, WCs, M&E, ceilings and floor finishes
- Plan site set-up and logistics: cabins, fencing, cranes and vehicles
Lessons
- Place components · 3 min
- Blocks and your own components · 4 min
- Fit-out library · 5 min
- Site set-up, logistics and vehicles · 5 min
The exercise
Fit out and set up the site
You do this in Studio with a practice file from the Academy, save it, and upload it. We check your drawing against these points:
- A WC from the fit-out library
- A tower crane
- At least 10 interlocking concrete blocks
- At least one fire safety item
The module test
5 questions. You need 80% to pass, and every answer comes with an explanation.