Spatial Brief Academy / Module 8 of 13
Module 8 · 1 hour
External works, falls and drainage
By the end of this module you can
- Draw footpaths, roads, car parks and paved areas with kerbs and edging
- Set slopes and falls to gullies
- Design ramps to Approved Document M and dropped kerbs
Lessons
- Paths, roads and paved areas · 5 min
- Slopes and falls to a gully · 4 min
- Ramps to Approved Document M · 5 min
- Dropped kerbs and crossovers · 2 min
The exercise
External works and falls
You do this in Studio with a practice file from the Academy, save it, and upload it. We check your drawing against these points:
- A footpath at least 10 m long
- The yard surface has a fall
- A ramp
The module test
5 questions. You need 80% to pass, and every answer comes with an explanation.