Right of way and new access gates
Waste site, existing and proposed access

About this model
Switch between the existing and proposed right of way, watch an HGV use the new gates, and view the site from the lane, the gates and the batter.
How to move: Drag to orbit, right-drag to pan, scroll or pinch to zoom.
Model note: Illustrative. Boundary length measured, lane and yard scaled from aerial imagery, new building from the proposed site plan.
What you can do
- Existing and Proposed schemes
- Animated HGV with pause and play
- Open or close the new gates
- Seven viewpoints: Aerial, Plan, Up the lane, Gate A, Gate B, From the batter, New building
- Labels on or off