Spatial Brief Academy / Module 13 of 13
Module 13 · 1½ hours
Final project and final test
By the end of this module you can
- Take a job from a topographical survey and a written brief to issued, priced drawings
- Pass the final test
The final project
Final project: Unit 4, Hollin Lane
A client wants a single-storey industrial unit on the course site. You have the topographical survey and this brief. Draw it, level it, price it and issue the drawing.
- The course survey is imported with the spike left out
- At least one survey layer you don't need is hidden
- External walls 24 000 × 15 000 mm
- A floor slab at 43.250 m
- Two rooms, including an office of about 27 m²
- The rooms are named
- A roller shutter (or double door) and a personnel door
- A yard of 200 m² or more, levelled, on the survey
- The estimate has at least one of your own rates
- The sheet is titled for Unit 4, drawn by you, status FOR ISSUE
- The drawing has been exported to PDF
The final test
20 questions from across the course. You need 80% (16 of 20) to pass. Then claim your Certificate of Proficiency.