Spatial Brief Academy / Studio Access course / Module 4 of 8
Studio Access · Module 4 · 1 hour
Loading docks and service yards
By the end of this module you can
- Set out HGV dock bays along a dock face and check a lorry reversing into every bay from both directions
- Find the least yard depth and the least bay spacing, and explain what those figures are
- Compare the check's yard depth with the industry rule of thumb and recommend the larger
Lessons
- Setting out the dock and checking the bays · 15 min
- The least yard depth and bay spacing · 12 min
- The check against the rule of thumb · 10 min
The exercise
Loading docks and the yard depth
You do this in Studio with Studio Access and a practice file from the Academy, save it, and upload it. We check your drawing against these points:
- A row of 5 dock bays at 3800 mm centres along the marked dock face (its ends within 500 mm of the face's)
- Dock bay checks with the Articulated HGV 16.5 m covering every bay from both directions (10 positions), whole lorries standing
- The yard is set to at least 35.0 m deep, the larger of the check's least depth and the rule of thumb
- A text label containing both yard depths in metres (each within 0.1 m of the figures the check gave)
- No dock check is out of date
The module test
7 questions. You need 80% to pass, and every answer comes with an explanation.
This module comes with Studio Access. Module 1 is open to everyone who signs in.